Coming up to
the LONG tunnel. It is 3/4 of a mile long. You couldn't see
the end. In the days when the trains went through in the winter,
there were two
men on either end that would open and shut the doors to the tunnels,
so that
the tunnel wouldn't freeze. About 50 trains a day went through the
tunnels.